Abstract
In this paper, we deal with the multi-objective machine cell formation problem. This problem is characterized as determining part route families and machine cells such that the total sum of inter-cell part movements and maximum machine workload imbalance are simultaneously minimized. Together with the objective function, alternative part routes and the machine sequences of part routes are considered in grouping part route families. Also, it is assumed that the number of machine cells is not pre-defined. Owing to the complexity of the problem, a two-phase heuristic algorithm is proposed. Computational experiments were conducted to verify the performance of the algorithm. Throughout the computational experiments, we verified that the two-phase heuristic algorithm is effective for large-scale machine cell formation problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.