Abstract

This research deals with a two-level method of production planning and scheduling problems of the reentrant hybrid flow shops. The hybrid flow shop has serial stages where each stage consists of identical parallel machines. Products can be processed at any one of the parallel machines at a stage in the hybrid flow shop. Also a product may have reentrant operations which require revisits of some stages several times. We consider a two-level hierarchical process on production planning and scheduling of the reentrant hybrid flow shop with the bi-objective function to improve productivity and customer satisfaction. Computational experiments show that the combination of preemptive goal programming based production planning algorithms and Pareto genetic based scheduling algorithms outperforms other two-level algorithms. Also we provide results of the application of the proposed method to both randomly generated problems and a real world Thin Film Transistor and Liquid Crystal Display (TFT-LCD) industry.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.