Abstract

This paper investigates a number of design, operation and lifetime management experiences of transformer protection systems installed on National Grid Electricity Transmission (NGET) networks. The paper will consider the policy, application design and operational experiences under the following categories particularly since the move to numeric protection: policy and application design; operational experience to date; a bespoke transformer protection scheme solution; maintenance and post commissioning support. Examples of protection mal-operations during transformer energisation are discussed in the paper. A bespoke transformer overall protection scheme is presented for application of the scheme on a transformer banked with a long cable circuit (> 5 km). (6 pages)

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.