Abstract

The standard gamma process is widely used for degradation modelling when the degradation paths are always positive and strictly increasing. Nevertheless, the standard gamma process is considered inappropriate if the observed sample paths are horizontal over several time intervals. Motivated by this phenomenon, we develop a time-discrete and zero-adjusted gamma process model. Statistical inference method of this model is then proposed. To illustrate our proposed model, both simulation study and real data analysis are conducted, whose results demonstrate that the proposed model has satisfactory fit performance and predictive performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call