Abstract

We consider two variants of a time–cost tradeoff problem with multiple assessments on a chain precedence graph. Furthermore, each job can only be started after a release time, and a penalty cost is incurred when a job is not finished before its due date. The motivation is from the project such that a project owner can control the duration of each job and the support level of each project partner to avoid the penalty cost from the tardy jobs. We describe the penalty costs of the first and the second variants as the total weighted number of tardy jobs and the total weighted tardiness, respectively. These can be avoided by compressing the processing times or advancing the release times, which incurs a compression cost or release cost according to the linear and the piecewise constant functions, respectively. The objective is to minimize the total penalty, compression cost and release cost. In this paper, we propose the procedure based on the reduction to a shortest path problem, and show that the procedure can solve two variants in strongly polynomial time.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.