Abstract

This paper deals with the simultaneous distributed generation (DG) planning and distribution network reconfiguration (SDGNR) issue. The problem is formulized as an optimization model which includes three types of variables, i.e. DGs location as the integer variables, DGs operating point as the continuous ones and switches open\\close state as the binary variables. A new approach entitled three-dimensional group search optimization (3D-GSO) method is also introduced to cope with such a problem. The proposed method is a general optimization scheme applicable to all types of optimization problems which deal with an integer, continuous, and binary variables at the same time. The revised approach is successfully applied to the SDGNR problem with the objective of total loss reduction in power distribution systems. Power flow criteria, as well as operation constraints, are all together accommodated in the process of optimization. Five different scenarios at three load levels are also considered to cover all possible conditions. The validity of the proposed 3D-GSO approach in handling SDGNR problem is assured through comprehensive simulation studies on 33-bus and 69-bus test systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.