Abstract

In order to realize the three-dimensional visualization of overlying strata separation after coal seam mining, this paper proposes a three-dimensional modeling method of overburden separated layer of TIN-DEM integrated model. First of all, the original drilling data are combined with the Kriging interpolation algorithm to generate virtual drilling. And a TIN model is established before mining. Then, UDEC is used to simulate a working surface in two dimensions. And a DEM model of overburden separated layer is established. By correcting the pre-mining model, the stratum model (TIN-DEM) containing the overburden separated layer is established. Finally, instance verification is carried out through real data of a certain mine.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.