Abstract

Fossil fuels are the primary sources of electricity generation in Pakistan. The energy demand and supply gap have intensified recently due to the massive population and fossil fuels are unable to meet the gigantic energy requirement of the country. Meanwhile, they also have adverse environmental impacts. Remote rural regions that are far away from the national grid do not have any means to fulfill their energy needs. The off-grid solar photovoltaic (PV) system has emerged to be the best energy option to electrify these remote regions. However, the strategic problem pertaining to local electricity generation is the absence of the area-specific generation capacity and economic feasibility data for solar energy. To address this problem, this study aims to assess the potential and economic viability of utilizing an off-grid solar PV system for rural electrification in the Punjab province of Pakistan. The research results reveal that there is an excellent solar irradiance in the rural areas of Punjab for electricity generation. In addition, suitable tilt angles have been calculated to increase the energy output of solar PV in the respective regions. Furthermore, this study has undertaken the economic viability for solar PV systems, and it was found that electricity generation from the solar PV costs Pakistani rupees (PKR) 7.15 per kWh and is much cheaper than conventional electricity, which costs PKR 20.7 per kWh. Besides, the system can reduce carbon emissions considerably. If 100% of the unelectrified households adopt solar PV system, then 617,020 metric tons of CO2 could be mitigated annually. Based on research findings, this study has suggested essential policy recommendations that would serve as a guideline for the government and stakeholders to maximum deploy the off-grid solar PV rural electrification programs in Punjab as well as on a national scale.

Highlights

  • Electricity is the backbone for the economic and social development of a country.1.1 billion people are living without electricity in the world [1]

  • This study has suggested essential policy recommendations that would serve as a guideline for the government and stakeholders to maximum deploy the off-grid solar PV rural electrification programs in Punjab as well as on a national scale

  • The off-grid solar PV system has been identified as the best energy option to electrify rural regions of Punjab province due to its easy installation, transportation, and maintenance

Read more

Summary

Introduction

Electricity is the backbone for the economic and social development of a country. 1.1 billion people are living without electricity in the world [1]. Most of the population experiencing this situation belongs to the rural areas of Sub-Saharan Africa and South Asia [2,3]. A large population of Pakistan is living in rural areas, and most of them do not have electricity access. Pakistan is facing social and environmental challenges. The ever-increasing population has raised the demand for energy in the country. The current power demand of the country is 25,000 megawatts (MW), whereas the power supply is only 17,000 MW, producing a gap of 8000 MW [4]. The electricity shortfall is 12 h/day in urban areas and Processes 2019, 7, 708; doi:10.3390/pr7100708 www.mdpi.com/journal/processes

Objectives
Methods
Results
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.