Abstract
Abstract When a process diagnosed as a bottleneck in a manufacturing system, we can improve its performance by redesigning the layout of facilities. In this study, the facilities are considered resilient for the first time, since due to resilience engineering principles the flexible and redundant facilities are considered in the production line beside the maintenance center with teamwork between its members. To encounter the proposed single-row facility layout problem, a unique fuzzy simulation and fuzzy mathematical model is tailored. In this regard, a discrete-event-simulation method is used to model all the possible layouts of an injection process. Then the results of the fuzzy simulation are imported to the fuzzy data envelopment analysis (F-DEA) to rank different layouts and find the optimal one. The criteria for this assessment are average waiting time (WT) and utility of resource (UR) as conventional key performance indicators (KPIs), in addition to fault tolerant, and flexibility as resilience engineering factors. Finally, the weights of the effective factors are obtained by sensitivity analysis. Also, implementing an integrated model in a real case study of a refrigerator injection process for a home appliance firm in Iran presents the solution quality.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.