Abstract

Traditional optimisation method for block erection scheduling in shipbuilding assumes that the activity durations are determined, and usually takes the minimisation of project makespan as the objective. We analyse the activities in the process of block erection, and address the characteristic of activity resource elasticity that the duration of some activities was elastic and could be impressed by the means of increasing the amount of resource availability. In this paper, we propose an optimisation method for block erection scheduling problem in shipbuilding with the objective of minimising the project cost and project deadline, which is an extension of Resource Availability Cost Problem RACP. The proposed method is a global research algorithm based on tabu search strategy. Experimental results for the simulation proved the effect of the characteristic of activity resource elasticity for the scheduling problem, and tested the performance of our algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.