Abstract
AbstractCoupling of biogas upgrading and power‐to‐X is challenging due to the intermittent cheap energy availability. A system was designed that overcomes the technical challenges in this coupling. This is possible by alternating biogas upgrading and methanol synthesis in a reactor operating both as sorption‐enhanced synthesis reactor and as upgrading unit by pressure swing adsorption. It was observed that this concept is feasible in both fixed‐ and fluidized‐bed reactors, and the potential for economic performance improvement was quantified in approximately 20 % increase of the internal rate of return.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.