Abstract

Increasing demand for energy requires large-scale construction of power plants and adequate growth of the transmission network. Currently, several high-voltage transmission subsystems (110, 220, 400, 500, and 750 kV) coexist in the same network. We investigate the mechanism of substitution of voltage for the medium-size energy system in Romania by using the Marchetti-Nakicenovic model and Romanian data of the period 1965–1981. The horizon of our prediction is up to the year 2030.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call