Abstract
Conformance testing may be seen as mean to execute an IUT (implementation under test) by carrying out test cases in order to observe whether the behavior of the IUT is conforming to its specifications. However, the development of distributed testing frameworks is more complex and the implementation of the parallel testing components (PTCs) should take into consideration the mechanisms and functions required to support interaction during PTC communication. In this article, the authors present another way to control the test execution of PTCs by introducing synchronization messages into the local test sequences. Then, they suggest an agent-based simulation to implement synchronized local test sequences and resolve the problem of control and synchronization.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Grid and High Performance Computing
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.