Abstract

Application of instrumentation, control and automation (ICA) is a reasonable way to improve the operation of wastewater treatment plant (WWTP), which has been realized in China but is still underway. A survey was carried out in Taihu Lake basin to investigate the current situation of ICA application. The survey focuses on control variable monitoring, instrument maintenance, control strategies, control manners and facility types. Survey results show that the process variables have not been adequately monitored and used for process control. The instruments are lack of sufficient maintenance, which causes control systems unreliable or left unused. Set-point control strategies are widely adopted and implemented mainly relies on manual on-site manners. On/off controllers predominate in treatment units. The survey results can be used as a reference to understand and help increase the ICA levels in WWTPs of China.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.