Abstract

This two-part paper surveys the frequency and voltage control ancillary services in power systems from various parts of the world. In this second part, essential economic features that must be taken into account when designing markets for ancillary services are first discussed. The methods adopted in eight different systems (Australia, France, Germany, Great Britain, New Zealand, PJM, Spain, and Sweden) for trading frequency and voltage control ancillary services are then compared. Lastly, new indicators for comparing volumes and costs of ancillary services across systems are proposed and calculated for the systems included in this survey. The companion paper surveys the technical features of these ancillary services

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.