Abstract

There is an increasing demand for infrastructure projects all over the world. One important model adopted in providing them is Public –private partnership. To this end, this study aims at identifying the most influential factors as well as new factors that will serve as barriers against the adoption of PPP as a model in procurement of social projects in Technical Universities in Ghana. Using a survey questionnaire, appropriate data were obtained from Ghanaian Technical Universities. In all, a total of 152 questionnaires were collected from the participants. The research found that `lack of governmental guidelines and procedures’ was perceived as the most important factor with a mean score of 4.12. The remaining four factors in descending order include; ‘high risk relying on the public sector, high charge to direct users, very few scheme reach the contract stage and high participation cost. These are depicted with the following mean scores (4.10, 4.02, 4.01 and 3.99 respectively. The factors considered as neither most important nor least important include; less employment positions, lack of experience and appropriate skills, a great deal of management time spent on contract transactions and lengthy delays in negotiations. Interesting enough, the factors that are considered as least important include; excessive restrictions on participations for PPP with a mean score average of 3.67. Also, high project cost and political instability were also perceived as least important. This shows that these two factors were not seen as the same most important hindrances. The results shows that practitioner’s (public institutions and private investors) should consider these key factors as barriers to be address for adoption and implementation of a successful achievement of PPP projects.
 Citation: Mumuni Ishawu, Chen Guangyu, Emelia Darko Adzimah, Aliu Mohammed Aminu. A Survey Analysis on Institutional Challenges in implementing Public Private Partnership (PPP) Projects: A perspective from a developing economy of Ghana, 2020; 5 (2): 24-35.
 Received: April 14, 2020 Accepted: June 30, 20

Highlights

  • Countries all over the world are using Public Private Partnership (PPP) model to procure infrastructure projects, including developing countries such as Ghana.(Tingtin, Yan, & Suzanne, 2016,; Marlies, Koen, Thomas., 2017)

  • In August, 2013, the government of Ghana emphasized that the Polytechnics have the capacity to be transformed into technical universities as they are better equipped than most of the private universities

  • Above, the mean scores for the sixteen factors ranging from 3.80 to 4.51, which indicates that most of the factors are of different importance as perceived by the overall respondents as the barriers for successful implementation of PPP projects in Ghana

Read more

Summary

Introduction

Countries all over the world are using Public Private Partnership (PPP) model to procure infrastructure projects, including developing countries such as Ghana.(Tingtin, Yan, & Suzanne, 2016,; Marlies, Koen, Thomas., 2017). The cost of maintaining existing infrastructure and undertaking necessary extensions as well as repairs of its coverage is estimated at seven percent of developing countries’ Gross Domestic Product (GDP), equivalent to about 600 billion US dollars (Alpana, 2012) In developing economy such as Ghana, there is the necessity for practical and skills human resource for Ghana’s overall development. In August, 2013, the government of Ghana emphasized that the Polytechnics have the capacity to be transformed into technical universities as they are better equipped than most of the private universities They will be in a better position to train middle level manpower needs of the country which will assist in the development of the nation. There is the need to improve upon the infrastructure facilities of these technical universities

Objectives
Methods
Results
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.