Abstract
Some surplus soil coordination models between construction sites have been developed in order to make efficient soil transport plan for recycling of surplus soil. However these models can't consider the uncertainties related to construction commencing time, duration, and soil volume, except of Minami and Simazu Model (1988) that can deal with the only uncertainty of construction commencing time. In this study, a model dealing with all of the above uncertainties was developed by improving the Minami and Simazu model. Then the model's applicability was shown through the application.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.