Abstract

With the advent of science and technology there is a rapid growth in all the fields in the world. The innovations in the various fields are making the world a better mobility to the people. These technological booms have moved the field of structural engineering in leaps and bounds. This project deals with the analysis of multi span simply supported bridge and design of bridge structure manually. This high level bridge is designed as the proposal for replacement of the existing causeway located at Sathyamanagalam - Periyakodiveri road. The main objective of the project is to analysis and design of the entire structure comprising of foundation, deck slab and pier etc. Calculation of total span and height of the bridge based on linear water way and high flood level. To Design the deck slab based on IRC loading conditions and enhance the various features of the bridge. Keywords: Bridges, Pavement, RCC continuous girder bridges, Causeway.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call