Abstract

The efficacy of a BWMS with filtration + membrane separation + deoxygenation technology in treating ballast water was investigated under marine operational circumstances in five shipboard tests. The shipboard tests were carried out between August 2020 and March 2021 onboard a bulk carrier JIN HAI HUA, which sailed between Mawei, Qinhuangdao and Caofeidian in China throughout spring, summer, and fall season. The discharge results in all five tests met the D-2 standard in IMO BWMS Code, with the shortest holding time of less than three days. The BWMS does not involve application of chemicals or generation of by-products, and is considered to be an appropriate choice for certain types of ships.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call