Abstract

KPX(Korea Power Exchange) predicts that summer peak load will be 70,700MW and system overload will be 150% from contingency analysis. This paper presents a method to operate power system at 2010 summer peak. about equipment variation, power system variation, analysis results of voltage stability, and the method to relief overload by comparing 2009 and 2010. Especially, transmission constraints to prevent global contingency in Korea power system and the role of SPS(Special Protection System) to prevent voltage collapse when fault occurs are introduced.