Abstract

KPX(Korea Power Exchange) predicts that summer peak load will be 70,700MW and system overload will be 150% from contingency analysis. This paper presents a method to operate power system at 2010 summer peak. about equipment variation, power system variation, analysis results of voltage stability, and the method to relief overload by comparing 2009 and 2010. Especially, transmission constraints to prevent global contingency in Korea power system and the role of SPS(Special Protection System) to prevent voltage collapse when fault occurs are introduced.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.