Abstract
The renewable energy resources, such as photovoltaic generation and wind turbine, are rapidly being integrated. In order to compensate for the variable output and imbalance between actual and scheduled outputs, introduction of a battery storage would be one of the promising solutions. In this paper, we focus on the scheduled operation of a balancing group (BG) consisting of the widely distributed photovoltaic generation with storage battery. BG forming would bring reduction of total imbalance due to cancellation of forecast errors among PV stations, and could enable cooperative usage of battery storages for imbalance compensation. This paper proposes a new battery storages operation scheduling for the BG considering the imbalance risk, which are assumed based on the confidence interval forecast for PV output. Effectiveness of the proposed scheduling method is ascertained through year-basis computational simulation of the BG. Advantages of BG forming is also discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.