Abstract

Nowadays, many countries are competing in the erection of long-span bridges with main span longer than 2,000 m owing to the tremendous innovations realized in the domain of high performance and high strength materials as well as in the design and construction technologies. The near future will see a boom in the market of suspension bridges with main span longer than 3,000 m. Since three-dimensionally shaped high concrete pylons would be unavoidably required to construct these super long-span bridges, need is to develop advanced slip form systems for their erection. This paper presents the development of a slip form system applying lightweight GFRP panel. Improved slip form management technology is secured by introducing a slip-up technique using GPS-based verticality control and wireless early strength estimation. A mock-up test is conducted by designing and fabricating the slip form system based on the developed techniques.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.