Abstract

Because of the global warming issue, the attention to renewable energy such as photovoltaic generations has increased. It is assumed that a lot of photovoltaic generations will be installed in the future according to Japanese government plans to install 28GW by 2020 and 53GW by 2030. However, it is expected that, when the load demand is low, surplus power occurs in the power system with a large penetration of photovoltaic generations. This issue is generally called “surplus power issue”. In the previous study, it was shown that the cost increase for absorbing surplus power by the existing DHC is inexpensive when it is assumed that the capacity of the DHC is constant. However, the initial construction cost of equipment must be considered from the viewpoint of the total cost of the DHC. In this paper, the DHC contribution considering the initial cost of equipment is studied.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.