Abstract

To solve design and construction problems of Monglian tunnel under high geothermal, based on the change rules of thermal parameters of surrounding rock and lining during excavation period, this paper analyzed the temperature distribution, heat transfer in tunnel and interaction between lining and surrounding rock, then by using numerical simulation, the relationship between temperature field and mechanical characteristics of lining and surrounding rock was discussed. Finally, the methods of using blast furnace cement, utilizing wet spraying concrete construction technology, and making surrounding rock exposure time as short as possible to reduce damages high temperature caused was proposed. The result can provide experience in similar tunnel design and construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.