Abstract

ABSTRACT Shipyards face tough problems such as ineffective production control and poor planning. Identifying appropriate work packages is one of the challenges of ship production planning. Work packages consist of a group of sub-works. The activities of block production that must be completed at each work station are referred to as sub-works. This study proposes a two-stage hierarchical model for assessing work packages in a balanced way. The paper focuses on providing a predetermined completion time rather than minimising the project's completion time. Work packages are determined within the two stages. The first stage is developed to identify the boundaries of the metaheuristic search. A metaheuristic search procedure is implemented in the second stage. The simulated annealing (SA) optimisation algorithm is the foundation of this procedure. The findings reveal a link between sub-work size and work package configuration. Accordingly, smaller-sized sub-works provide a more balanced work package configuration.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.