Abstract

Water conservancy and hydropower projects are the important parts of national capital construction. Since the reform and opening up, it has been 30 years,construction trade develops fast and the construction market takes initial shape.Butwith the constant development of the reform and opening up and national economy,higher request is put forward in construction engineering and construction trade, withmany characteristics of large investment, long time, high construction difficulty, complicated technology and engineering participants in water conservancy and hydropower construction project, and many unforeseen factors occur in construction process. The engineering project is a high-risk construction process, and participants of engineering construction face all kinds of risks inevitably, so if we do not guard against it, this will cause the engineering construction not to go on smoothly, even cause serious consequences. Therefore, the risk management of engineering project is particularly important. To study the risk of construction projects, and to strengthen the risk management of construction engineering project, which can adapt to the objective demand of international construction market, and are good for national capital construction and national economic development.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call