Abstract

A case study of Nagoya municipal subway, we compute transfer-required time from transfer resistance and individual movement speed. Besides, we pick out the optimum route plus train schedule by Subway Route Information System. The term “ the optimum route” can be defined in this study as the shortest time route and the least consumption energy route. Judging from the above, we inquire into computing route information.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.