Abstract

Minimization of active power losses is one of the essential aims for any electric utility, due to its importance in improvement of system properties towards minimum production cost and to support increase load requirement. In this paper we have studied the possibility of reducing the value of real power losses for (IEEE-14- Bus bar) global system transmission lines by choosing the best location to install shunt capacitor depending on new algorithm for calculate the optimal allocation, which considering the value of real power losses derivative with injection reactive power as an indicator of the ability of reducing losses at load buses. The results show the validity of this method for application in electric power transmission lines.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.