Abstract

The Three Gorges Power Market (TGPM) is the first cross-region power market in China. In order to build efficient and high performance power markets in China, a significant problem is to determine the bulk power market hierarchical structure. In this paper, based on international experiences on power markets, common rules in power market design and operation, and real conditions of Chinese power industry, possible alternatives of power market hierarchical structures are outlined and studied. A two-level structure for the Chinese power markets is then proposed. They are national and regional power markets. Based on the two-level Chinese power market structure plan, the TGPM structure and its market participants are further suggested.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.