Abstract

Scheduling of automated material handling equipment is a commonly encountered problem in advanced manufacturing environments. It occurs whenever there is a choice as to the order in which robots can be dispatched to deliver jobs to various locations. In this paper, the manufacturing environment of interest is an automated electroplating system where hoists (robots) are used to move printed circuit boards (jobs) between tanks for treatment. Previous studies were restricted to the unidirectional transfer of jobs between tanks. However, when the manufacturing environment is constrained by floor space (a common situation in Hong Kong), hoists must be allowed to transfer jobs bidirectionally to minimize the number of identical tanks in the system. A visual simulation model was developed to assess the performance of three popular dispatching rules for the bidirectional multi-hoist production scheduling system. These three dispatching rules are (1) nearest robot first (NRF), (2) average robot assignment (ARA), and (3) boundary shift by job location (BSJL).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.