Abstract

In order to treat soil contaminated with high percentages of water and petroleum, the combined microwave and thermal desorp- tion process was studied, which was composed of the consecutive connection of two pre-treatment processes. For the thickness of the contaminated soil layer on the transfer conveyor belt, the optimal total petroleum hydrocarbon (TPH) removal rate was studied with respect to the duration of microwave exposure in the consecutive process combined with thermal desorption. The TPH removal rate when the contaminated soil layer thickness was 1 cm at 6 kW of microwave power was 80%. The removals rates for 2 and 3 cm soil layer thicknesses were both 70%. Under identical experimental conditions, the TPH removal rate for the microwave pre-treatment, when considering the soil particle size, was over 70%. The lowest TPH removal rate was achieved with a particle diameter of 2.35 mm. For contaminated soil with 30% water content, 6 kW and a thermal desorption temperature of 600oC were the optimal operational condi- tions for the removal of THP. However, considering the fuel consumption cost, 4 kW and a thermal desorption temperature of 300 o C

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.