Abstract
This article presents the study and development of the control system of fruit dehydration machine by biomass energy in which manual control system was upgraded to the Auto one. Study results revealed that Auto control system required less operation time for as much as 1.30 hour. By comparing energy consumption of the two systems, the upgraded system required less energy approximately 751.30 baht/month and 9,016.32 baht/year. When the break-even point is taken into consideration, this system upgrade could payback after 3.33 year. The author really hopes that this study can be used as a guideline for those interested or involved in the development fruit dehydration machine.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: ECTI Transactions on Application Research and Development
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.