Abstract

This paper presents a comprehensive model that captures significant strategic decisions involved in designing or redesigning high-performance supply chains from the perspective of the manufacturer. The problem considers deterministic demand by multiple clients, for multiple products, over the periods of a long-term horizon. The design decisions involve selection of suppliers, establishment or resizing of production facilities and distribution centres, possible subcontracting of related activities, and selection of transportation modes and routes. The problem is formulated by a Mixed Integer Linear Programming model. Its objective is to minimise the overall costs associated with procurement, production, inventory, warehousing, and transportation over the design horizon. Appropriate constraints model the complex relationships among the links of the supply chain. The proposed model has been applied to a large case study of a global manufacturing firm, providing valuable insights into the transformation of the firm’s current supply chain network, as well as into the potential of the proposed approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call