Abstract
We consider n jobs to be scheduled on two parallel machines. The jobs are subject to intree precedence constraints, that is, each job, except one which is the root of the tree, has one successor. The job of the root is at level 0 and a job is at level l if its predecessor is at level l − 1. A job can start to be processed only after all its predecessors have finished. Job processing times are independent random variables with those at the same level being identically distributed. The objective is to minimize the expected completion time of the last job. Such a model can be applied to assembly line and computational problems. This paper generalizes a result of Pinedo and Weiss.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.