Abstract
Plug-in hybrid electric vehicle (PHEV) charging station is playing a critical role in the rapid development of PHEVs. The unique characteristics of charging demands provide flexibility for the resource planning of PHEV charging station, while its internal generation resources and procurement decisions from utility grid offer various options to meet the charging demand. To achieve the maximum benefits while managing the associated risk, the operator of PHEV charging station should optimally schedule those resources on both supply and demand sides. In this paper, a stochastic resource-planning scheme for PHEV charging stations is proposed, while two types of PHEV charging loads, including price-responsive commercial charging customers and the contracted controllable charging fleets, are taken into the account. Energy supply decisions on energy procurement in multiple markets and internal generation scheduling are co-optimized with demand-side decisions on charging service pricing and controllable demands allocation. The uncertainties from spot market price and availability of renewable generations are considered in the proposed model. A numerical case study is also provided to illustrate the effectiveness of the proposed scheme.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.