Abstract

This paper presents a stochastic cost model and a solution technique for optimal scheduling of the generators in a wind integrated power system considering the demand and wind generation uncertainties. The proposed robust unit commitment solution methodology will help the power system operators in optimal day-ahead planning even with indeterminate information about the wind generation. A particle swarm optimization based scenario generation and reduction algorithm is used for modeling the uncertainties. The stochastic unit commitment problem is solved using a new parameter free self adaptive particle swarm optimization algorithm. The numerical results indicate the low risk involved in day-ahead power system planning when the stochastic model is used instead of the deterministic model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.