Abstract

As the number of plug-in electric vehicles (PEVs)increase, the need for public fast-charging stations intensifies. In such facilities, concurrent charging of several vehicles significantly increases demand charges and stress supporting network elements. In this paper, we propose a stochastic fast charging station model which accommodates PEV demand through power drawn from the grid and an on-site energy storage system. The latter is used to lower peak demand and improve grid reliability. The station is modeled by a 2-dimensional Markov chain and the performance is measured by outage probability. The proposed model allows the station operator to optimally provision system resources to provide a good quality of service to customers. Numerical results indicate significant gains in net profit and useful insights can be made with the right choice of storage size.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.