Abstract

Disassembly is the most critical stage of remanufacturing activities. The condition of parts disassembled for reuse/remanufacturing display a high variance. Hence demand for different parts found in a core cannot always be satisfied by a single core. At this point the question is whether or not to partially disassemble the second core. In this study, we concentrate on quantifying the potential benefits of this decision in a remanufacturing environment by using a queueing network model with kanban control. The model is solved by an approximate method, and the impact of profitability on partial disassembly decisions is studied by numerical analysis.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.