Abstract

A scheme that allows the dispatch of steady and controllable level of power from a wind power generating station is proposed in this paper. The scheme utilizes two battery energy storage systems (BESSs) in which the generated wind power is used to charge one BESS, while the second BESS is used to discharge constant power into grid. The role of the two BESS interchanges when the discharging BESS reaches specified operating limit. With this scheme in mind and based on given wind speed statistics, charging characteristics of the BESS are studied, and a method to determine the expected charging time of the BESS to reach stipulated battery state of charge is developed. The expected BESS charging time, in turn, dictates the constant power level that can be dispatched to the grid through the discharging BESS. The corresponding discharge time is also determined using the developed method, the accuracy of which is validated experimentally. The proposed design procedure is then used to determine the minimum BESS capacity based on the expected wind power. Statistical likelihood of dispatchable power delivery achievable from the scheme is also obtained.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.