Responding to the extreme scarcity of medical resources during the early outbreak of the coronavirus disease (COVID-19) in Wuhan, China, an emergency specialist hospital of Leishenshan started to construct on January 26, 2020, and accommodate patients on February 6, 2020. The clinical laboratory center of Leishenshan Hospital (CLCLH) was constructed at the same time within 11 days to support the treatment of inpatients in Leishenshan Hospital and the testing of suspected patients from different fever clinics in Wuhan. The CLCLH could perform a total of 320 clinic, 299 biochemistry, 31 microorganism, and 47 infection and immunity examinations per day. It could also complete an average of 239 nucleic acid tests and 118 severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2) antibody examinations per day. No suspected cases were documented among the health care workers during the operation of the CLCLH. The construction and operation experiences of the CLCLH is provided in this study and might be used by other countries as reference. The content of this study is divided into 4 parts: (1) the establishment of the CLCLH, including its layout and medical resource allocation; (2) the major testing items; (3) the specific procedure of COVID-19 indicator examination; and (4) the standardized personal protection measures.

Highlights

  • Responding to the extreme scarcity of medical resources during the early outbreak of the coronavirus disease (COVID-19) in Wuhan, China, an emergency specialist hospital of Leishenshan started to construct on January 26, 2020, and accommodate patients on February 6, 2020

  • The test scale remains limited for countries with increasingly severe pandemic situations because the effect of COVID-19 directly results in the collapse of the medical system and the medical test system

  • The clinical laboratory center was constructed to support the treatment of inpatients in the Leishenshan Hospital and scale up the COVID-19 testing in Wuhan

Read more

Summary

Introduction

Responding to the extreme scarcity of medical resources during the early outbreak of the coronavirus disease (COVID-19) in Wuhan, China, an emergency specialist hospital of Leishenshan started to construct on January 26, 2020, and accommodate patients on February 6, 2020. The clinical laboratory center of Leishenshan Hospital (CLCLH) was constructed at the same time within 11 days to support the treatment of inpatients in Leishenshan Hospital and the testing of suspected patients from different fever clinics in Wuhan. The construction and operation experiences of the CLCLH is provided in this study and might be used by other countries as reference. The clinical laboratory center was constructed to support the treatment of inpatients in the Leishenshan Hospital and scale up the COVID-19 testing in Wuhan. It was built in parallel with the hospital ward in 11 days and officially started its operations on February 15, 2020

Objectives
Methods
Findings
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call