Abstract

Capacitive equipment refers to its insulation design using the principle of capacitance of electrical equipment, mainly by a variety of different capacitive components in series. Most of the equipment in the substation is capacitive equipment. Once an insulation failure occurs, it will lead to extremely serious consequences. Monitoring grid overvoltage and insulation degradation of capacitive equipment is an effective means to ensure the stable operation of the power system. Therefore, in order to enhance the health management of capacitive equipment, including transformers, bushings, and current transformers, and to mitigate the risk of severe failures, it is imperative to conduct broad-spectrum frequency-domain online monitoring of overvoltages, dielectric losses, and partial discharge. However, the current monitoring work requires the utilization of multiple detection apparatuses. Aiming at the disadvantage that the existing inspection is not well integrated and requires a combination of multiple devices. This paper proposes a smart grid overvoltage identification system that utilizes partial discharge (PD) signals in correlation with dielectric loss detection. The system achieves synchronous detection of dielectric loss and high-frequency partial discharge by synchronously and in real-time acquiring four current signals from the power grid, enhancing the integration level of the hardware system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.