Abstract

In this paper, a multi-product Economic Production Quantity (EPQ) inventory model for a defective production system by a single machine is considered. The faulty produced products are reworked or are put on auction as they are. The aim of this research is to determine the optimal cycle length and the percentage of reworking every fault product such that the total inventory cost, including setup, production, holding, reworking, and lost profit, is minimized. We have proved that this problem is a convex non-linear programming method. Therefore, we came up with the exact algorithm based on differentiation to solve it. Finally, a sensitivity analysis is performed to evaluate the effect of changes in different parameters of the problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.