Abstract

The aim of this paper is to study a simultaneous lot-sizing and scheduling in multi-product, multi-period flexible flow shop environments. A new mixed integer programming (MIP) model is proposed to formulate the problem. The objective function includes the total cost of production, inventory, and external supply. In this study, in case of not meeting the demand of customers, this demand should be met by foreign suppliers in higher price. Due to the high computational complexity of the studied problem, a rolling horizon heuristic (RHH) and particle swarm optimization algorithm (PSO) are implemented to solve the problem. These algorithms find a feasible and near-optimal from production planning and scheduling. Additionally, Taguchi method is conducted to calibrate the parameters of the PSO algorithm and select the optimal levels of the influential factors. The computational results show that the algorithms are capable of achieving results with good quality in a reasonable time and PSO has better objective values in comparison with RHH. Also, the real case study for tile industry with real features is applied. Sensitivity analysis is used to evaluate the performance of the model.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.