Abstract

Lean Production approach provides a framework to limit source of variability and to improve performance of production systems. If production units characterized by low-volume and part combining are considered, lean approach has to be tuned in order to provide the correct limitation of work-in-progress and the suitable sequencing of parts. In such a case, a discrete event simulation study is necessary to illustrate the control-element operations and indicate the applicability of the elements. A case study in the field of earth-moving machine is considered. A simulation study proved that the implementation of lean elements lead to a significant performance improvement.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.