Abstract

The despatch bay is a critical interface within an organisation, linking the warehousing and transport operations. However, delays here have wider supply chain implications given that the flow of materials through the supply chain is disrupted. Despite this, there has been little research on improvement activities to this process. This paper uses a case study of a steel processor to develop a simulation model to test strategies for increasing despatch bay productivity. From the simulation results, it was found that a combination of improvements were needed, to both reduce process times and ensure the earlier receipt of orders. The research approach presented in this paper can be used in other business environments having similar operating conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.