Abstract

Dual cycling is an operation technique whereby quay cranes perform loading and unloading operations simultaneously in the same ship bay. In this article, a mixed-integer programming model for quay crane dual-cycling scheduling is developed. The model considers the stowage plan of outbound containers and the operation sequence of quay cranes. To solve the model, a heuristic method, called bi-level genetic algorithm, is designed. Meanwhile, a simulation optimization method integrating the intelligent decision mechanism of the optimization algorithm and evaluation function of simulation model is proposed. Numerical experiments indicate that dual cycling can reduce the operation time of quay cranes compared to the method of scheduling loading and unloading separately. Moreover, the model and algorithms developed in this article can tackle quay crane dual-cycling problem efficiently.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.