Abstract
Construction of low-income housing projects is a recurring process and is associated with uncertainties that arise from the unavailability of resources. This paper presents a case study that discusses how computer simulation and optimisation are used to aid government agencies and/or contractors in planning of such projects. It illustrates the optimisation of project objectives, taking into consideration the interaction amongst involved resources. As such, total duration and the associated total costs, including direct and indirect costs, can be estimated and optimised. One Youth Habitation project that is executed in 6th of October City in Egypt is analysed in a step-by-step procedure to demonstrate the capability of proposed computer simulation and optimisation prototype (named LIHouse{_}Sim) in the modelling construction of low-income housing projects using bearing block walls with hollow core technique. The presented tool proves its practicality to contractors in estimating the time and costs of the recurring process of low-income housing construction, considering complex interdependencies between construction resources and the uncertainties associated with construction activities. The LIHouse{_}Sim prototype is used to perform a wide analysis for the alternative of the effective optimisation criteria in the bearing block walls/hollow core technique and for the genetic algorithm optimisation approach elements.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.