Abstract

A simulation-based heuristic approach is presented for a resource investment problem (RIP). This version of the RIP considers the trade-off between the number of resources, project makespan and resource utilization. A win-win goal is a reduction in project makespan while improving resource utilization. The RIP heuristic is presented as an executive for RCAN, a simulation tool that produces solutions to the multi-mode resource constrained project scheduling problem (RCPSP). The RIP heuristic uses feedback from RCAN to iteratively modify a set of renewable resources. The heuristic is shown to be effective on real-world, large-scale depot maintenance projects. In addition, the simulation tool uses a priority rule approach to schedule project tasks for the RCPSP problem. Therefore the RCPSP priority rule has a major effect on the RIP heuristic. An analysis is presented showing how various priority rules impact the RIP heuristic's ability to reduce the makespan while maintaining or increasing resource utilization.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call