Abstract
Resource constrained project scheduling problems are very difficult to solve to optimality. Because of the computational complexity, scheduling heuristics have been found useful for large deterministic problems. However, these scheduling heuristics have not been applied to problems with stochastic task durations. Heuristics are often combined to try to achieve better performance. When this is done, a search over all possible combinations is generally required. This is again a very computationally intensive task, especially for stochastic problems. We demonstrate how a genetic algorithm can be used to determine the best linear combination of scheduling heuristics. A simulation model is used to evaluate the performance of each combination of the heuristics selected by the genetic algorithm, and this performance information is used by the genetic algorithm to select the next combinations to evaluate. The genetic algorithm and simulation based approach is demonstrated using a multiple resource constrained project scheduling problem with stochastic task durations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.