Abstract

In a dynamic flexible manufacturing system (FMS) environment jobs arrive randomly, and in most of the existing studies the due date for a single part is set individually. However, when the due date is set for an order that consists of multiple parts, some completed parts may have to wait for the rest of the order to be completed. This paper studied the scheduling problem in the FMS in which orders require the completion of different parts in various quantities. The orders arrive randomly and continuously, and all have predetermined due dates. Two scheduling decisions were considered in this study: launching parts into the system for production, and determining the order sequence for collecting the completed parts. A new part-launching rule, named the Tardiness Estimating Method (TEM) was proposed. A discrete-event simulation model of the FMS was developed and used as a test-bed for experiments under various system conditions. The proposed part launch rule was capable of providing good performance regarding minimum mean tardiness and maximum service level, but provided only a moderate flow time when compared with the other five rules commonly used in the literature. In addition, three order collection rules were tested in the experiments. Collecting parts for the order with the earliest due date (EDD) was found better than the other rules for tardiness related measures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.